Violation Detail
Standard Cited: 19100184 C09 Slings.
Inspection Nr: 1811413.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,550.00
Current Penalty: $8,275.00
Issuance Date: 05/02/2025
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 06/02/2025
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 05/22/2025
Related Event Code (REC): A;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/22/2025 | $8,275.00 | 06/02/2025 | Serious | |
Penalty | Z: Issued | 05/02/2025 | $16,550.00 | 05/13/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.184(c)(9): Employee(s) were not kept clear of load(s) suspended, or about to be lifted by sling(s): Vehtek Systems, Inc. - Bowling Green, Ohio: On or about March 10, 2025, the employer did not ensure that employees were kept clear of loads about to be lifted, and of suspended loads, when using an overhead crane and wire-rope slings to lift the RH Check Fixture (1801056600) in the CMM lab. Employees were exposed to injury in the event of material displacement and/or falling material. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.