Violation Detail
Standard Cited: 19260502 D11 Fall protection systems criteria and practices.
Inspection Nr: 1805570.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,620.00
Current Penalty: $5,958.00
Issuance Date: 07/10/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/12/2025
Gravity: 10
Report ID: 0213900
Contest Date:
Final Order: 07/24/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/24/2025 | $5,958.00 | 09/12/2025 | Serious | |
Penalty | Z: Issued | 07/10/2025 | $6,620.00 | 07/22/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.502(d)(11): Lifelines were not protected against being cut or abraded: a) 1600 Avenue of the States, Lakewood, NJ - Third Floor Fa�ade - An employee installing a curtain wall glazing system was provided with a wire rope sling (choker hitch) anchorage point as part of a personal fall arrest system. The wire rope anchorage was in direct contact with the edge of the welded steel attachment points for the glazing unit assembly without protection from cuts or abrasions, thus exposing the employee to a fall hazard of 30-feet, on or about February 21, 2025. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION AND DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.