Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1803660.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,550.00
Current Penalty: $0.00
Issuance Date: 05/30/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/18/2025
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 07/08/2025
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/08/2025 | $0.00 | 07/18/2025 | Serious | |
Penalty | Z: Issued | 05/30/2025 | $16,550.00 | 07/18/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i):The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. (A) The periodic inspection shall be performed by an authorized employee other than the ones(s) utilizing the energy control procedure being inspected. (B) The periodic inspection shall be conducted to correct any deviations or inadequacies identified. (C) Where lockout is used for energy control, the periodic inspection shall include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected. a) On or before 2/4/2025 the employer did not conduct periodic inspection of each energy control procedures annually, for equipment such as but not limited to; the energy control procedures for the AIDA (model # NC1-1500(2)E) SER # C0415-1735), to ensure that the documented machine specific procedure was adequate to prevent exposure to moving parts including auxiliary equipment of the mechanical power press.