Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1797370.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,093.00
Current Penalty: $16,550.00
Issuance Date: 06/13/2025
Nr Instances: 5
Nr Exposed: 10
Abatement Date: 01/22/2026
Gravity: 1
Report ID: 0523400
Contest Date: 07/08/2025
Final Order: 12/22/2025
Related Event Code (REC):
Emphasis:
Substance: 0170
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/22/2025 | $16,550.00 | 01/22/2026 | Serious | |
| Penalty | C: Contested | 07/08/2025 | $7,093.00 | 07/11/2025 | Serious | |
| Penalty | Z: Issued | 06/13/2025 | $7,093.00 | 07/11/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
1910.119(d)(3)(i)(B) Piping and instrument diagrams (P&ID's); (a) Anhydrous Ammonia Refrigeration Systems: On or about January 13, 2025, inspection of the piping system on the roof identified that piping was inaccurately labeled and piping and instrumentation diagrams (P&ID)'s R106 & R105 did not reflect the current piping configuration associated with DR, HGD, HTRS, and the HTRL lines. The HTRL lines were label duplicatively and did not have unique identification. The P&IDs R106 & R105 did not have the correct nomenclature for each line in the system in that the 2 HTRL lines were label the same and could not be differentiated on the P&ID's. (b) Anhydrous Ammonia Refrigeration Systems: On or about January 13, 2025, inspection of the piping system on the roof, identified that P&IDs R106 & R105 did not reflect current piping configuration associated with DR, HGD, HTRS, HTRL, & HTRL. P&IDs R106 & R105 did not have the correct nomenclature for each line in the system in that the DR was represented as HTRS. (c) Anhydrous Ammonia Refrigeration Systems: On or about January 13, 2025, inspection of the piping system on the roof, identified that P&IDs did not reflect current piping configuration associated with DR. The DR was missing in P&ID R106 for the AU1, AU5, AU7, and AU8. (d) Anhydrous Ammonia Refrigeration Systems: On or about January 13, 2025, inspection of the piping system on the roof, identified that P&IDs did not reflect current piping configuration associated with LLTS. The LLTS was removed in the expansion of the system in 2013. (e) Anhydrous Ammonia Refrigeration Systems: On or about January 13, 2025, inspection of the piping system on the roof, identified that P&IDs R106 & R105 did not reflect current piping configuration associated with DR, HGD, HTRS, HTRL, & HTRL. P&IDs R106 & R105 did not have any diameter values for each line in the system.