Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1795858.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,045.00
Current Penalty: $7,000.00
Issuance Date: 04/25/2025
Nr Instances: 2
Nr Exposed: 8
Abatement Date: 06/12/2025
Gravity: 5
Report ID: 0134000
Contest Date:
Final Order: 05/08/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/08/2025 | $7,000.00 | 06/12/2025 | Serious | |
Penalty | Z: Issued | 04/25/2025 | $14,045.00 | 06/12/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i) - The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Location - Throughout Facility On or about 01/02/2025, periodic inspections of the energy control procedures for equipment utilized and maintained onsite had not been conducted.