Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1794910.015
Citation: 01002
Citation Type: Other
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $4,729.00
Current Penalty: $0.00
Issuance Date: 06/11/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/18/2025
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 07/14/2025
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/14/2025 | $0.00 | 07/18/2025 | Other | |
Penalty | Z: Issued | 06/11/2025 | $4,729.00 | 07/18/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.850(a): Evidence in writing was not available that an engineering survey performed by a competent person had been performed prior to permitting employee(s) to start demolition operations: (a) Former Hotel Property at 677 Roosevelt Road, Glen Ellyn, IL 60137, On or about December 20th, 2024, an engineering survey was not maintained in writing prior to performing demolition operations, thereby exposing employees to the potential of an unplanned structural collapse. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).