Violation Detail
Standard Cited: 19260652 D02 Requirements for protective systems.
Inspection Nr: 1792547.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,585.00
Current Penalty: $9,268.00
Issuance Date: 01/24/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/20/2025
Gravity: 10
Report ID: 0729700
Contest Date:
Final Order: 02/12/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/12/2025 | $9,268.00 | 02/20/2025 | Serious | |
Penalty | Z: Issued | 01/24/2025 | $11,585.00 | 02/20/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.652(d)(2): Manufactured materials and equipment used for protective systems were not used and maintained in a manner that would have prevented employee exposure to hazards: At the jobsite located at W. Willow Avenue and Sewell Avenue, in Colby, Kansas, employee(s) engaged in trenching and excavation activities were exposed to cave in and engulfment hazards. The protective system present inside a trench did not extend along the entirety of the trench or extend above the edges of the trench which did not protect employee(s) exposed to those hazards.