Violation Detail
Standard Cited: 19100269 B Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1791154.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $14,895.00
Current Penalty: $8,937.00
Issuance Date: 05/01/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/28/2025
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 05/15/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/15/2025 | $8,937.00 | 05/28/2025 | Other | |
Penalty | Z: Issued | 05/01/2025 | $14,895.00 | 05/28/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(b): The employer did not provide medical services and first aid as required in 1910.151: (a) On or about November 04, 2024, at the jobsite, an employee received arc flash burns and the supervisor did not provide medical services and first aid to the employee.