Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1785692.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,768.00
Current Penalty: $0.00
Issuance Date: 04/28/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/22/2025
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 05/23/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/23/2025 | $0.00 | 05/22/2025 | Serious | |
| Penalty | Z: Issued | 04/28/2025 | $12,768.00 | 05/22/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) On or about October 28, 2024, and times prior to, in the evaporator room, the employer did not conduct a periodic inspection of the CIP Evaporator tank and did not utilize the energy control program developed to manually relieve the caustic and acid from the evaporator tank.