Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1783978.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,550.00
Current Penalty: $9,930.00
Issuance Date: 03/28/2025
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 04/23/2025
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 04/11/2025
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/11/2025 | $9,930.00 | 04/23/2025 | Serious | |
| Penalty | Z: Issued | 03/28/2025 | $16,550.00 | 04/23/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): (a) On October 18, 2024, employees were not protected from any part of their body being caught in the spout spool at the low end of the depositor of the Hinds-Bock twin servo pump filler on line 2 in that its point of operation was not guarded when unclogging during normal operation. (b) On October 18, 2024, employees were not protected from any part of their body being caught in the spout spool at the low end of the depositor of the Hinds-Bock twin servo pump filler on line 3 in that its point of operation was not guarded when unclogging during normal operation.
Translate