Violation Detail
Standard Cited: 19260651 J01 Specific Excavation Requirements.
Inspection Nr: 1781777.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 12/17/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/30/2024
Gravity: 10
Report ID: 0317700
Contest Date:
Final Order: 01/17/2025
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 12/17/2024 | $16,131.00 | 12/30/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.651(j)(1): Adequate protection was not provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face: a) Project Harmony, 1442 Pennsylvania Highway 940, Lake Harmony, PA - On or about October 11, 2024, an employee was installing a storm drainpipe within an eight (8) foot deep trench without an adequate system to protect the employee from loose rock or soil. ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED