Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1780522.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,550.00
Current Penalty: $0.00
Issuance Date: 02/11/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/26/2025
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 03/21/2025
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/21/2025 | $0.00 | 02/26/2025 | Serious | |
Penalty | Z: Issued | 02/11/2025 | $16,550.00 | 02/26/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. On or about October 3, 2024, at the previously addressed job site, the employer had not performed annual periodic inspections of the energy control procedures for STI G16 Stacker.