Violation Detail
Standard Cited: 19260405 A02 II I Wiring methods, components, and equipment for general use.
Inspection Nr: 1778419.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,282.00
Current Penalty: $5,000.00
Issuance Date: 03/06/2025
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 03/27/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/27/2025 | $5,000.00 | Serious | ||
Penalty | Z: Issued | 03/06/2025 | $7,282.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage: a) On or about September 30, 2024, the employer did not ensure that all flexible cords used for temporary wiring, including the extension cord suppling power to the Hercules 4 ?" Heavy Duty Angle Grinder, Model HE61S, were protected from damage. The extension cord was run over an active roadway that was traveled by large commercial vehicles and showed signs of damage. No abatement certification or documentation is required for this item.