Violation Detail
Standard Cited: 19100305 G01 IV Wiring methods, components, and equipment for general use.
Inspection Nr: 1777398.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,828.00
Current Penalty: $8,296.80
Issuance Date: 12/18/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/31/2024
Gravity: 5
Report ID: 0420600
Contest Date:
Final Order: 01/15/2025
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/15/2025 | $8,296.80 | 12/31/2024 | Other | |
| Penalty | Z: Issued | 12/18/2024 | $13,828.00 | 12/31/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.305(g)(1)(iv): Flexible cords and/ or cables were used for purposes prohibited by paragraphs (A) through (F) of 29 CFR 1910.305(g)(1)(iv) a) In the Warehouse located at 2998 Broadway Center Blvd Brandon, FL: On or about 9/24/2024, the employer exposed employees to electrical shock hazards, in that flexible cords and/ or cables were used in place of permanent wiring.
Translate