Violation Detail
Standard Cited: 19100333 B02 II A Selection and use of work practices
Inspection Nr: 1773825.015
Citation: 01002
Citation Type: Serious
Abatement Date: 03/26/2025 2
Initial Penalty: $13,005.00
Current Penalty: $7,803.00
Issuance Date: 02/28/2025
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC):
Gravity: 5
Report ID: 0420600
Contest Date:
Final Order: 03/25/2025
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/25/2025 | $7,803.00 | 03/26/2025 | Serious | |
Penalty | Z: Issued | 02/28/2025 | $13,005.00 | 03/26/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.333(b)(2)(ii)(A): Safe procedures for deenergizing circuits and equipment were not determined before circuits or equipment are deenergized. a. At the mixing plant building: On or about September 4, 2024, the employer exposed employees to a 120-voltage electrical hazard, in that the employer did not identify all electric energy sources to be deenergized prior the replacement or maintenance of the IMP Screw Drive electrical circuit disconnect.