Violation Detail
Standard Cited: 19100147 C06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1772047.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,067.00
Current Penalty: $4,840.20
Issuance Date: 09/10/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/04/2024
Gravity: 5
Report ID: 0729700
Contest Date:
Final Order: 10/03/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/03/2024 | $4,840.20 | 10/04/2024 | Serious | |
Penalty | Z: Issued | 09/10/2024 | $8,067.00 | 10/04/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed: Employees engaged in servicing and maintenance activities at the following equipment in the fabrication department shop/area, and throughout the different buildings of the plant were exposed to burn, electrical, struck-by, caught-in and caught-between hazards in that machine specific energy control procedures had not been reviewed since 2010 to correct any deviations or inadequacies identified in the procedure, to ensure the procedures are still up to date, correctness, and being followed, implemented. Employees perform servicing and maintenance activities on equipment including, but not limited to, Rousselle Press machine (Model 6F; Serial FF-509-64), Rousselle A4 Twisted Die Press machine (Model 3; Serial DA-6904), and Summit 100-Ton Press machine (Model A9) which had multiple energy sources including pneumatic, mechanic, electric, and gravity.