Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1771342.015
Citation: 01002
Citation Type: Serious
Abatement Date: 02/27/2025
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 02/07/2025
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0627100
Contest Date: 03/07/2025
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 03/11/2025 | $16,550.00 | 02/27/2025 | Serious | |
Penalty | Z: Issued | 02/07/2025 | $16,550.00 | 02/27/2025 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On or about August 22, 2024, VRT conveyor, employees performed service and maintenance activities such as but not limited to making adjustments without machine specific procedures being developed, documented and utilized.