Violation Detail
Standard Cited: 19100430 B04 Equipment.
Inspection Nr: 1757758.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $8,066.00
Issuance Date: 12/09/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0420300
Contest Date:
Final Order: 01/08/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/08/2025 | $8,066.00 | Serious | ||
Penalty | Z: Issued | 12/09/2024 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.430(b)(4):The output of air compressor systems shall be tested for air purity every 6 months by means of samples taken at the connection to the distribution system, except that non-oil lubricated compressors need not be tested for oil mist. On or about June 25, 2024, the employer did not test the Rolair compressor systems for air purity for over six months, thereby exposing the employees to the possibility of contaminated air. compressor systems for air purity for over six months, thereby exposing the employees to the possibility of contaminated air.