Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1747269.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,524.00
Current Penalty: $6,000.00
Issuance Date: 09/30/2024
Nr Instances: 1
Nr Exposed: 30
Abatement Date: 10/18/2024
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 10/24/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2024 | $6,000.00 | 10/18/2024 | Serious | |
Penalty | Z: Issued | 09/30/2024 | $11,524.00 | 10/18/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: (a) On or about May 8, 2024, doors designated as emergency exits were locked on the west end of the facility located at 9740/9742 W. Foster Ave., Chicago, IL 60656. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.