Violation Detail
Standard Cited: 19260405 B01 Wiring methods, components, and equipment for general use.
Inspection Nr: 1745659.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $3,803.00
Current Penalty: $3,803.00
Issuance Date: 07/22/2024
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 07/26/2024
Gravity: 5
Report ID: 0524700
Contest Date: 08/14/2024
Final Order: 06/20/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | W: Empr Withdrew | 06/20/2025 | $3,803.00 | 07/26/2024 | Serious | |
Penalty | C: Contested | 08/15/2024 | $3,803.00 | 07/26/2024 | Serious | |
Penalty | Z: Issued | 07/22/2024 | $3,803.00 | 07/26/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.405(b)(1):Unused openings in cabinets, boxes, and fittings were not effectively closed: On or about May 1, 2024 the employer MDM & Sons Construction, LLC at jobsite located at 1003 Brampton Park Rd. (Lot 81) Perrysburg OH 43551, failed to ensure that openings on a Milbank brand temporary power unit panel box (240V - 125Amp) were effectively closed and unused openings in cabinets, boxes, and fittings were effectively closed. Employees working in the vicinity of the open electrical power unit panel box service disconnect (circuit breakers) in this energized 240 volt condition were exposed to electrical shock and potential electrocution hazards.