Violation Detail

Standard Cited: 19100333 B02 IV Selection and use of work practices

Inspection Nr: 1740812.015

Citation: 01002

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $16,131.00

Current Penalty: $11,000.00

Issuance Date: 08/21/2024

Nr Instances: 1

Nr Exposed: 2

Abatement Date: 09/19/2024

Gravity: 10

Report ID: 0521100

Contest Date:

Final Order: 09/23/2024

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 09/23/2024 $11,000.00 09/19/2024 Serious  
Penalty Z: Issued 08/21/2024 $16,131.00 09/19/2024 Serious  

Text For Citation: 01 Item/Group: 002 Hazard:

29 CFR 1910.333(b)(2)(iv): Verification of deenergized condition. The requirements of this paragraph shall be met before any circuits or equipment can be considered and worked as deenergized. On or about April 1, 2024, at a jobsite located at 1919 South Broadway Street, in Green Bay, Wisconsin; in Building 141 on the second floor MCC Room, verification of de-energization of the 4160V switchgear on the load side and line side was not conducted prior to pulling wires for the Boiler 10 project exposing employees to electrical shock hazards.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.