Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
This violation item has been deleted.
Inspection Nr: 1728863.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $9,126.00
Current Penalty: $0.00
Issuance Date: 05/02/2024
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 06/20/2024
Gravity: 5
Report ID: 0111500
Contest Date:
Final Order: 05/28/2024
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/28/2024 | $0.00 | 06/20/2024 | Serious | |
| Penalty | Z: Issued | 05/02/2024 | $9,126.00 | 06/20/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: WORKSHOP: On/or about February 1, 2024, the rotating shaft ends of the Roasting Chain Conveyor System (peanut control area) and the Neopure Chain Conveying System were unguarded.
Translate