Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1722694.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,839.00
Current Penalty: $1,935.60
Issuance Date: 06/05/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/02/2024
Gravity: 1
Report ID: 0627100
Contest Date:
Final Order: 06/28/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/28/2024 | $1,935.60 | 07/02/2024 | Serious | |
Penalty | Z: Issued | 06/05/2024 | $4,839.00 | 07/02/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: On or about January 24, 2024, at the grinding and brushing department, employees were engaged in work activities related to grounding the welds and wire-brushing the surfaces of the trailers, where the exit door at the northeast corner was blocked.