Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1719881.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $6,222.00
Current Penalty: $1,348.00
Issuance Date: 05/17/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/17/2024
Gravity: 1
Report ID: 0830600
Contest Date:
Final Order: 06/18/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/18/2024 | $1,348.00 | 06/17/2024 | Other | |
Penalty | Z: Issued | 05/17/2024 | $6,222.00 | 06/17/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i):The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: (a) On or about January 2, 2024, and at times prior, the employer did not evaluate the lockout/tag out (LO/TO) program and procedures associated with de-energizing the MAC Process Model MD40 Airlock to remove a 55-gallon drum . The employer authorized using the on/off controls and bump procedures to remove jams exposing employees to caught-in and amputation hazards. An employee suffered multiple finger amputations on the right hand when reaching into the airlock system attempting to remove a jam while a supervisor was operating the controls.