Violation Detail
Standard Cited: 19100176 A Handling materials - general.
Inspection Nr: 1708887.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $13,828.00
Current Penalty: $13,828.00
Issuance Date: 02/08/2024
Nr Instances: 1
Nr Exposed: 10
Abatement Date:
Gravity: 5
Report ID: 0213400
Contest Date:
Final Order: 03/19/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/08/2024 | $13,828.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.176(a): Where mechanical handling equipment is used, sufficient safe clearances were not provided in aisle ways. Aisles and passageways were not kept clear with no obstructions across or in aisles creating a hazard. a) General Plumbing Supply, Inc./980 New Durham Rd/Edison, NJ 08817 - Building B: The employer did not ensure that aisle ways were kept clear in order for Powered Industrial Vehicle operators to be able to maneuver while conducting material handing operations, thereby exposing employees to struck by hazards. Observed on or about 11/7/2023.