Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 1705926.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,218.00
Current Penalty: $9,218.00
Issuance Date: 03/26/2024
Nr Instances: 1
Nr Exposed: 17
Abatement Date: 04/19/2024
Gravity: 5
Report ID: 0316300
Contest Date:
Final Order: 04/26/2024
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 03/26/2024 | $9,218.00 | 04/19/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.219(c)(2)(i): All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting: a) Radford Army Ammunition Plant Piccolo small motor shack: On or about 10/25/2023, motor M622 shaft assembly was not fully guarded as a result exposed employees to a possible hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate