Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1696106.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,046.00
Current Penalty: $6,027.60
Issuance Date: 11/06/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/06/2023
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 11/30/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/30/2023 | $6,027.60 | 12/06/2023 | Serious | |
Penalty | Z: Issued | 11/06/2023 | $10,046.00 | 12/06/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): (a) Wet Batch Plant Mixer (Plant 23); The energy control procedure utilized for cleaning behind the wet batch plant mixer did not include all machine specific procedural steps for isolating each energy source, to include but not be limited to, the emergency tilt system motor.