Violation Detail
Standard Cited: 19100333 B02 IV B Selection and use of work practices
Inspection Nr: 1696002.015
Citation: 01002
Citation Type: Serious
Abatement Date: 03/07/2024
Initial Penalty: $14,518.00
Current Penalty: $14,518.00
Issuance Date: 02/09/2024
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0524530
Contest Date: 03/01/2024
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 03/01/2024 | $14,518.00 | 03/07/2024 | Serious | |
Penalty | Z: Issued | 02/09/2024 | $14,518.00 | 03/07/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.333(b)(2)(iv)(B): Before circuits or equipment was worked as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed and did not verify that the circuit elements and equipment parts were deenergized: On or about August 14, 2023, a qualified person did not use test equipment to test and verify a 480-volt conductor for the 'Truck Loadout Pump' circuit, energized through circuit breaker #17 in the MSP-3 panel located in the DDE MCC room was deenergized prior to work started to replace wiring in the outdoor raceway.