Violation Detail
Standard Cited: 19100269 D02 IV B Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1695721.015
Citation: 01002
Citation Type: Serious
Abatement Date: 03/29/2024
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/12/2024
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0420100
Contest Date:
Final Order: 03/18/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/18/2024 | $0.00 | 03/29/2024 | Serious | |
Penalty | Z: Issued | 02/12/2024 | $0.00 | 03/29/2024 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(d)(2)(iv)(B): The procedure did not clearly and specifically outline the procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: a) On or about September 1, 2023 at the Lagoon Creek Combustion Turbine employees performing fuel gas supply energy isolation were exposed to fire and struck-by hazards and the employer did not ensure the procedure clearly and specifically outline the procedural steps for shutting down equipment to control hazardous energy.