Violation Detail
Standard Cited: 19100029 B03 Fall protection systems and falling object protection-criteria and practices.
Inspection Nr: 1680058.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,162.00
Current Penalty: $11,162.00
Issuance Date: 10/05/2023
Nr Instances: 1
Nr Exposed: 27
Abatement Date: 11/01/2023
Gravity: 5
Report ID: 0316300
Contest Date:
Final Order: 11/07/2023
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/05/2023 | $11,162.00 | 11/01/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.29(b)(3): The employer did not ensure that guardrail systems are capable of withstanding, without failure, a force of at least 200 pounds (890 N) applied in a downward or outward direction within 2 inches (5 cm) of the top edge, at any point along the top rail: a) Radford Army Ammunition Plant, sulfuric acid, weak and pyro tank areas: On or about June 21, 2023, employees are exposed to a possible fall hazard resulting from severely weathered top rails of guardrail systems exceeding 2 inches in the outward direction when force is applied. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate