Violation Detail
Standard Cited: 19100119 F01 Process safety management of highly hazardous chemicals.
Inspection Nr: 1667708.015
Citation: 01002
Citation Type: Serious
Abatement Date: 12/06/2023 2
Initial Penalty: $15,625.00
Current Penalty: $15,625.00
Issuance Date: 11/01/2023
Nr Instances: 1
Nr Exposed: 27
Related Event Code (REC): A
Gravity: 10
Report ID: 0134000
Contest Date: 11/29/2023
Final Order: 03/25/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/25/2024 | $15,625.00 | 12/06/2023 | Serious | |
Penalty | C: Contested | 11/29/2023 | $15,625.00 | 12/06/2023 | Serious | |
Penalty | Z: Issued | 11/01/2023 | $15,625.00 | 12/06/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment. Location - Throughout; Hastelloy Suite. On or about 5/4/2023, the employer did not implement written procedures to maintain the on-going integrity of the PFN-2 agitator assembly, including but not limited to the bolt, agitator, and shaft.