Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1663320.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,696.00
Current Penalty: $6,696.00
Issuance Date: 09/29/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/26/2023
Gravity: 1
Report ID: 0625400
Contest Date:
Final Order: 10/31/2023
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 09/29/2023 | $6,696.00 | 10/26/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i):The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: On or about April 5, 2023, and at times prior thereto, the employer did not provide annual or more frequent inspections of the energy control procedures for employees conducting planned/scheduled maintenance, exposing employees to the hazards of unexpected startup.