Violation Detail
Standard Cited: 19100269 N02 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1659028.015
Citation: 01002
Citation Type: Other
Abatement Date: 10/02/2023 2
Initial Penalty: $15,625.00
Current Penalty: $15,625.00
Issuance Date: 09/13/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 10/10/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/10/2023 | $15,625.00 | 10/02/2023 | Other | |
Penalty | Z: Issued | 09/13/2023 | $15,625.00 | 10/02/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(n)(2)(i): Lines and equipment were not deenergized according to the provisions of paragraph (m) of this section: On or about March 22, 2023, at a remote location behind a personal residence, energized lines in a transformer were not deenergized prior to work commencing, exposing employees and contract employees to the hazard of coming in contact with energized parts.