Violation Detail
Standard Cited: 19100119 L02 II Process safety management of highly hazardous chemicals.
Inspection Nr: 1654714.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $15,625.00
Current Penalty: $7,812.50
Issuance Date: 08/09/2023
Nr Instances: 1
Nr Exposed: 275
Abatement Date: 09/26/2023
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 08/22/2023
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/22/2023 | $7,812.50 | 09/26/2023 | Serious | |
Penalty | Z: Issued | 08/09/2023 | $15,625.00 | 09/26/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(l)(2)(ii): The procedures shall assure that the following considerations are addressed prior to any change the impact of change on safety and health. (a) On or about March 6, 2023, no management of change (MOC) had been done prior to the explosion to ensure that the existing plastic curtain strips located in the Bldg. 81 compressor room west doorway that melted during the incident, were not static dissipative and did not contribute to the hydrogen explosion.