Violation Detail
Standard Cited: 19100269 M03 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1645712.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $15,625.00
Current Penalty: $15,625.00
Issuance Date: 07/14/2023
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 10
Report ID: 0213400
Contest Date: 08/07/2023
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 08/11/2023 | $15,625.00 | Serious | ||
Penalty | Z: Issued | 07/14/2023 | $15,625.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(m)(3)(i): The employee that the employer designates pursuant to paragraph (m)(2) of this section as being in charge of the clearance shall make a request of the system operator to deenergize the particular section of line or equipment. The designated employee becomes the employee in charge (as this term is used in paragraph (m)(3) of this section) and is responsible for the clearance. A) Consolidated Edison Co. - Holsman Rd. and Campus Rd., Staten Island NY 10301 - The supervisor did not ensure that section of the electrical lines that was being worked on was deenergized by the Control Center Operator exposing employees to electrical hazards. Employees were exposed to the hazards of electrical shock and burns. Condition noted on or about January 18, 2023.