Violation Detail
Standard Cited: 19100269 M03 I Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1641599.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $15,625.00
Current Penalty: $0.00
Issuance Date: 05/23/2023
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 06/20/2023
Gravity: 10
Report ID: 0626300
Contest Date: 06/14/2023
Final Order: 04/10/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/10/2024 | $0.00 | 06/20/2023 | Serious | |
Penalty | C: Contested | 06/30/2023 | $15,625.00 | 06/20/2023 | Serious | |
Penalty | Z: Issued | 05/23/2023 | $15,625.00 | 06/20/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(m)(3)(i): A designated employee did not make a request of the system operator to have the particular section of line or equipment deenergized: a) On or about December 29, 2022, and at times prior thereto, in the Vault 1998 workplace, where the designated employee did not make a request to deenergize the three phase conductors inside Vault 1998, exposing employees to an arc fault hazard.