Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1636176.015
Citation: 01002
Citation Type: Serious
Abatement Date: 06/02/2023 2
Initial Penalty: $15,625.00
Current Penalty: $9,257.00
Issuance Date: 05/24/2023
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): A
Gravity: 10
Report ID: 0215000
Contest Date: 06/23/2023
Final Order: 07/18/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/18/2024 | $9,257.00 | 06/02/2023 | Serious | |
Penalty | C: Contested | 07/14/2023 | $15,625.00 | 06/02/2023 | Serious | |
Penalty | Z: Issued | 05/24/2023 | $15,625.00 | 06/02/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(b)(1):Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) Location: 263 West End Avenue, New York, NY 10023 On or about: November 28, 2022 (a) The employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked.