Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1636088.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,128.00
Current Penalty: $1,200.00
Issuance Date: 05/04/2023
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 1
Report ID: 0317500
Contest Date:
Final Order: 05/09/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/09/2023 | $1,200.00 | Serious | ||
Penalty | Z: Issued | 05/04/2023 | $4,128.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): As a substitute for the fixed wiring of a structure; (a) Model Cleaners 813 Greene Avenue, Altoona, PA, Outside Container Storage Area, on or about December 2nd, 2022, an extension cord and temporary electrical wiring was used in the 92 inch wide by 40 foot long outdoor storage containers used by employees performing loading and unloading of laundry into the containers from the 28 foot delivery truck.