Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1628965.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $3,929.00
Current Penalty: $2,187.50
Issuance Date: 03/03/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/09/2023
Gravity: 5
Report ID: 0521700
Contest Date:
Final Order: 03/31/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/31/2023 | $2,187.50 | 03/09/2023 | Serious | |
| Penalty | Z: Issued | 03/03/2023 | $3,929.00 | 03/09/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports: a) On October 18, 2022, employees engaged in framing work were exposed to the hazard of falling while working from a tubular welded frame scaffold platform that was not fully planked. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).