Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100303 B02 General.

Inspection Nr: 1628393.015

Citation: 01002

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $8,806.00

Current Penalty: $6,164.20

Issuance Date: 12/22/2022

Nr Instances: 2

Nr Exposed: 10

Abatement Date: 02/10/2023

Gravity: 5

Report ID: 0111100

Contest Date:

Final Order: 01/13/2023

Related Event Code (REC): C

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 01/13/2023 $6,164.20 02/10/2023 Serious  
Penalty Z: Issued 12/22/2022 $8,806.00 02/10/2023 Serious  

Text For Citation: 01 Item/Group: 002 Hazard:

29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: Pre-Sterile Area - Relocatable power taps (RPT) were not used in accordance with the listing and labeling, in the following instances: a) Near the Left Bottling Machine, Mobile Workstation - RPT was used in a wet or damp location. b) Near the Right Bottling Machine, Mobile WorkStation - RPT was used in a wet or damp location and an extension cord was plugged into the RPT.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close