Violation Detail
Standard Cited: 19260850 I Preparatory operations.
Inspection Nr: 1624755.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/21/2023
Nr Instances: 3
Nr Exposed: 2
Abatement Date: 06/29/2023
Gravity: 10
Report ID: 0316100
Contest Date:
Final Order: 04/19/2023
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/19/2023 | $0.00 | 06/29/2023 | Serious | |
Penalty | Z: Issued | 03/21/2023 | $0.00 | 03/29/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.850(i): Floor openings, not used as material drops, were not covered with a material substantial enough to support the weight of the load to be imposed: (a) On or about September 26, 2022, Building #205- Test Structure/Second Floor, Northeast Corner: Employees performing demolition operations near uncovered floor openings were exposed to fall hazards. Employees were working near uncovered floor openings measuring 10-feet high by 12-feet long by 5-feet wide. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.