Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1603906.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $14,502.00
Current Penalty: $14,502.00
Issuance Date: 12/08/2022
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 01/25/2023
Gravity: 10
Report ID: 0419400
Contest Date: 01/12/2023
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 09/12/2025 | $14,502.00 | 01/25/2023 | Serious | |
Penalty | Z: Issued | 12/08/2022 | $14,502.00 | 01/25/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(B):The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. (a) Rewinding - On or about June 23, 2022 employees are required to perform service on the R -74 rewinder machine without having specific written Lockout procedures to isolate all energy sources exposing employees to struck by hazards.