Violation Detail
Standard Cited: 19260652 A01 Requirements for protective systems.
Inspection Nr: 1603037.015
Citation: 01002
Citation Type: Serious
Abatement Date: 05/15/2023 2
Initial Penalty: $14,502.00
Current Penalty: $10,000.00
Issuance Date: 12/13/2022
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0830500
Contest Date: 01/06/2023
Final Order: 06/12/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/12/2023 | $10,000.00 | 05/15/2023 | Serious | |
Penalty | C: Contested | 01/09/2023 | $14,502.00 | 02/01/2023 | Serious | |
Penalty | Z: Issued | 12/13/2022 | $14,502.00 | 02/01/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c): a) 1910 Peregrine Dr. in Brighton, CO: On 06/18/2022, during the repair a 4-inch diameter (PVC) residential sanitary sewer line, an employee worked in a trench dug into B Type soil with vertical cut walls, that varied in depths of 11 to 13 feet, and was not protected from cave-in hazards by a protective system.