Violation Detail
Standard Cited: 19100094 A03 I Ventilation.
Inspection Nr: 1601618.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,252.00
Current Penalty: $5,439.00
Issuance Date: 11/07/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/20/2023
Gravity: 5
Report ID: 0523300
Contest Date:
Final Order: 11/18/2022
Related Event Code (REC): R
Emphasis:
Substance: 9130
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/18/2022 | $5,439.00 | 06/20/2023 | Serious | |
Penalty | Z: Issued | 11/07/2022 | $7,252.00 | 12/07/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.94(a)(3)(i): Blast cleaning enclosures were not exhaust ventilated in such a way continuous inward flow of air will be maintained at all openings during the blasting operation: On or about June 13, 2022, the Abrasive Blast Building did not have a continuous inward flow of air.