Violation Detail
Standard Cited: 19260800 F02 Underground Construction
Inspection Nr: 1599224.015
Citation: 01002
Citation Type: Other
Abatement Date: 3
Initial Penalty: $10,151.00
Current Penalty: $5,000.00
Issuance Date: 09/19/2022
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): C
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order: 11/15/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2022 | $5,000.00 | Other | ||
Penalty | Z: Issued | 09/19/2022 | $10,151.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.800(f)(2): Two effective means of communication were not provided in all shafts which were being developed or used either for personnel access or for hoisting in underground construction: On or about 5/8/2022 employees at the South Hartford Conveyance and Storage Tunnel were not provided two effective means of communication during underground tunneling operations.