Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1597531.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,360.00
Current Penalty: $6,000.00
Issuance Date: 08/17/2022
Nr Instances: 1
Nr Exposed: 25
Abatement Date: 09/09/2022
Gravity: 5
Report ID: 0213600
Contest Date:
Final Order: 09/09/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/09/2022 | $6,000.00 | 09/09/2022 | Serious | |
Penalty | Z: Issued | 08/17/2022 | $10,360.00 | 09/09/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i)(C):Where lockout was used for energy control, the periodic inspection did not include a review (at least annually), between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: a) On or about 05/25/2022 throughout the production area; where the periodic review of authorized employees was not performed at least annually. Documentation provided showed the last evaluations were performed in 2017, 2018, 2019 and not all authorized employees reviewed. ABATEMENT DOCUMENTATION REQUIRED