Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1595168.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,351.00
Current Penalty: $2,175.50
Issuance Date: 10/12/2022
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 11/16/2022
Gravity: 1
Report ID: 0418300
Contest Date:
Final Order: 11/04/2022
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 12/12/2022 | $2,175.50 | 11/16/2022 | Serious | |
Penalty | I: Informal Settlement | 11/04/2022 | $2,175.50 | 11/16/2022 | Serious | |
Penalty | Z: Issued | 10/12/2022 | $4,351.00 | 11/16/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.107(b)(5)(i): There were no visible gauges(s), audible alarm(s) or pressure activated device(s) installed on paint spray booth(s) to indicate or ensure that the required air velocity was maintained: (a) On or about 05/09/2022 - Spray booths 1-6, employees were exposed to fire hazards when functional manometers were not installed on the paint spray booths to indicate or ensure the required air velocity was maintained.