Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1585273.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,256.00
Current Penalty: $5,128.00
Issuance Date: 06/14/2022
Nr Instances: 1
Nr Exposed: 15
Abatement Date: 07/25/2022
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 07/07/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/07/2022 | $5,128.00 | 07/25/2022 | Serious | |
Penalty | Z: Issued | 06/14/2022 | $10,256.00 | 06/28/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a. Borgers Ohio, Inc. - Norwalk, Ohio: On or about March 8, 2022, a periodic inspection of the energy control procedures was not performed to ensure that lockout/tagout procedures and requirements of 29 CFR 1910.147 were being followed. The employer did not ensure that energy control procedures for Molding Cells were inspected annually. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.