Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1581195.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $10,151.00
Current Penalty: $10,151.00
Issuance Date: 07/22/2022
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 08/17/2022
Gravity: 10
Report ID: 0728500
Contest Date:
Final Order: 08/15/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/15/2022 | $10,151.00 | 08/17/2022 | Other | |
| Penalty | Z: Issued | 07/22/2022 | $10,151.00 | 08/17/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed. At the worksite located at 600 Wilson Industrial Road, Maryville, Missouri: The employer did not conduct an annual or more frequent inspection of the energy control procedure by each authorized personnel to ensure they were properly implemented during repair and service work on the rotary valve and way belt.