Violation Detail
Standard Cited: 19100147 C04 II C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1572026.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,977.00
Current Penalty: $5,982.75
Issuance Date: 07/01/2022
Nr Instances: 4
Nr Exposed: 2
Abatement Date: 08/01/2022
Gravity: 5
Report ID: 0627100
Contest Date:
Final Order: 08/01/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/01/2022 | $5,982.75 | 08/01/2022 | Serious | |
| Penalty | Z: Issued | 07/01/2022 | $7,977.00 | 07/28/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(C): The energy control procedure did not clearly and specifically outline the steps for placement, removal and transfer of lockout devices or tagout devices and the responsibility for them: On or about 1/10/2022, at the facility, in the following instances: a) Lockout Tagout Procedure for the Mixer: Missing steps for return to service; b) Lockout Tagout Procedure for the Large Bag House Fan: Missing application of lock on the circuit breaker to the Large Bag House breaker in the electrical pane; Missing steps for return to service; c) Lockout Tagout Procedure for the Middle Bag House Fan: Missing application of lock on the circuit breaker to the Middle Bag House breaker in the electrical pane; Missing steps for return to service; d) Lockout Tagout Procedure for the Small Bag House Fan: Missing application of lock on the circuit breaker to the Small Bag House breaker in the electrical pane; Missing steps for return to service;
Translate